Local plan scoping consultation

Search representations

Results for RPS Tetra Tech search

New search New search

Comment

Local plan scoping consultation

Recreation and community facilities

Representation ID: 5904

Received: 01/09/2026

Respondent: RPS Tetra Tech

Representation Summary:

he new Local Plan should be sufficiently flexible to enable provision to respond to evidenced local needs, through an appropriate combination of on-site provision, multifunctional green infrastructure and contributions towards existing facilities where there is, or will be, insufficient provision over the plan period.
The Council's intention to review standards for open space, parks, playing pitches and other recreational provision is supported in principle. Any local standards should be founded on an up-to-date assessment of existing provision, deficiencies and future needs, drawing on relevant national standards and best practice, tailored to Cheshire East's circumstances and tested alongside all other policy requirements.

Comment

Local plan scoping consultation

New evidence

Representation ID: 5905

Received: 01/09/2026

Respondent: RPS Tetra Tech

Representation Summary:

A robust and up-to-date evidence base is fundamental to preparing the new Local Plan. The Evidence Base listed in the Scoping Consultation appears comprehensive; equally important is timing. The HNA, Land Availability Assessment, Viability Assessment and IDP should be front-loaded, as they will shape the plan's housing policies and reduce the likelihood of significant changes at later stages. These documents should be kept up to date throughout preparation of the Local Plan, with any changes reflected consistently across the evidence base.

For instructions on how to use the system and make comments, please see our help guide.