Local plan scoping consultation

Search representations

Results for Mr Matthew Sidebotham search

New search New search

Comment

Local plan scoping consultation

Natural environment

Representation ID: 1296

Received: 03/08/2026

Respondent: Mr Matthew Sidebotham

Representation Summary:

Landscape and biodiversity

The countryside surrounding Sutton, Langley and Lyme Green forms an important part of the landscape setting of Macclesfield and the Peak District fringe.

The Local Plan should give substantial weight to protecting:

• Landscape character.

• Mature trees and hedgerows.

• Wildlife habitats and ecological corridors.

• Important views.

• Rural tranquillity.

• The transition between the urban area and open countryside.

Sustainability should not be measured solely by whether land is adjacent to an existing settlement. It should also consider the irreversible loss of agricultural land, natural capital, biodiversity, landscape quality, settlement identity and the long-term resilience of infrastructure

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 1297

Received: 03/08/2026

Respondent: Mr Matthew Sidebotham

Representation Summary:

Transparency of Call for Sites

I understand that land submitted through the 2024 and 2026 Call for Sites process has simply been put forward by landowners and developers for consideration and that these submissions do not represent proposed allocations or decisions by the Council.

For that reason I have deliberately avoided commenting on individual sites where the detailed evidence has not yet been published.

However, the existence of these submissions reinforces the importance of a transparent assessment process.

When site assessments are published, I ask the Council to provide, for every site affecting Sutton, Langley, Lyme Green, Gurnett and south-east Macclesfield:

• Clear site boundaries.

• Site size.

• Proposed use and capacity.

• Green Belt status.

• Agricultural land classification.

• Existing land use.

• Landscape assessment.

• Ecology and biodiversity constraints.

• Highway and transport assessment.

• Infrastructure assessment.

• Public rights of way and active travel considerations.

• Flood risk and drainage.

• Heritage constraints.

• Suitability, availability and deliverability assessments.

• The reasons why each site is progressed or rejected.

The Council should also publish a cumulative map showing existing allocations, completed developments, outstanding permissions and all submitted Call for Sites land so that residents can properly understand the overall impact of development around south and east Macclesfield rather than considering each site in isolation.

Comment

Local plan scoping consultation

Strategic green gap

Representation ID: 1298

Received: 03/08/2026

Respondent: Mr Matthew Sidebotham

Representation Summary:

Settlement separation

I encourage the Council to assess whether local green gaps or settlement separation policies are appropriate around Macclesfield.

The distinct identities of Sutton, Langley, Lyme Green and Gurnett should be protected so that successive developments do not gradually erode the separation between these communities and Macclesfield.

Comment

Local plan scoping consultation

2 New local plan

Representation ID: 1299

Received: 03/08/2026

Respondent: Mr Matthew Sidebotham

Representation Summary:

The respondent urges Cheshire East Council to adopt an evidence-led approach to future development, prioritising brownfield regeneration and urban capacity before considering greenfield or Green Belt release. They request protection of the distinct identities of Sutton, Langley, Lyme Green and Gurnett, alongside safeguards for agricultural land, landscape character, biodiversity and the Peak District fringe. Concerns are raised about cumulative development impacts, infrastructure capacity and the loss of settlement separation. The respondent calls for greater transparency through publication of site assessments, methodologies and locality-based maps, and requests meaningful public engagement before allocations are selected, ensuring development is sustainable, proportionate and supported by infrastructure.

For instructions on how to use the system and make comments, please see our help guide.