Local plan scoping consultation

Search representations

Results for Mr Paul Webster search

New search New search

Comment

Local plan scoping consultation

Role of the Strategy and Outcomes

Representation ID: 2936

Received: 27/08/2026

Respondent: Mr Paul Webster

Representation Summary:

At the date of the eventual adoption of the new Local Plan, a measure of the integrity of Cheshire East Council’s Plan preparation and content will be public recognition – or not – of the Plan as ‘The People’s Plan’.
An alternative perspective of the new Local Plan, already gaining traction, is of it being a ‘Developers’ Charter’.
It remains to be seen whether either view, or another view, prevails.

Comment

Local plan scoping consultation

2 New local plan

Representation ID: 4196

Received: 31/08/2026

Respondent: Mr Paul Webster

Representation Summary:

The list of matters that can be addressed in Local Plans includes “seeking good design in new developments”.
That is unduly cautious. It should have read, and be interpreted in the Cheshire East Local Plan as, “achieving good design in new developments”.

Comment

Local plan scoping consultation

Developing the new local plan

Representation ID: 4259

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

Para 2.6: points on transport modelling, review of infrastructure, future needs for housing and economic development, and other work to develop the evidence base - assessments of (i) best and most versatile agricultural land, and (ii) the ‘overheating’ of the north of Cheshire East relative to the south – a significant influence on the new Local Plan’s spatial distribution of development. Several factors cited indicate that.
Para 2.9: dates anticipated for the two formal consultation stages. Summer can reduce the capacity of some stakeholders to engage in the process. Risk: adding to inequality and inaccessibility in Local Plan engagement.

Comment

Local plan scoping consultation

Increase in housing requirements

Representation ID: 4266

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

At para 3.5, the annotation that Cheshire East’s housing need is “Based on latest dwelling stock figures (2025)” implies the housing need figure will vary as the latest dwelling stock figures vary.
Instead of that being left to an implied assumption, it would have been helpful for that to have been stated in the text, if correct – or explained, if incorrect.

Comment

Local plan scoping consultation

Spatial development strategy

Representation ID: 4268

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

Content of these paragraphs is superficial, especially as the Cheshire East Local Plan is to be “in general conformity” with the Cheshire and Warrington Spatial Development Strategy (SDS).
More information should be given, eg:
- how and when will stakeholders be consulted on the SDS?
- what and when will be stages of progression of the SDS before its adoption?
- will the adoption of the SDS require review of the Cheshire East Local Plan?

Comment

Local plan scoping consultation

Connectivity

Representation ID: 4272

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

As to the M6 and M56, their being “strong transport connections” is a strength weakened by traffic congestion.
Moreover, in July 2015 consultants AECOM stated in its Spatial Distribution Update Report:
“There are congestion issues on the highways network throughout Cheshire East, and these would be exacerbated wherever development occurs. As would be expected, the main issues relate to increased pressure on junctions along key routes into town centres and linking to the strategic road networks”.
(CEC engaged consultants, including AECOM, in the Council’s preparation of the current Local Plan.)

Comment

Local plan scoping consultation

Economic contribution

Representation ID: 4275

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

And there’s the rub, at para 4.6.
To the extent that there is over-development in Cheshire East or in parts of it, the Borough, or parts of it, will be less attractive for people to live in, work in or visit.
All the more reason for care in the spatial distribution of development.

Comment

Local plan scoping consultation

Heritage, culture and natural environment

Representation ID: 4283

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

Re: paras 4.11 and 4.12, the Local Plan should refer to the heritage and culture value of settlements, in addition to attractions and institutions of national or international importance, and other historic sites, parks and gardens.
A settlement can also be of national or international importance in its heritage and culture, and attract very many visitors.
Knutsford is the most obvious example in Cheshire East. Reason cited, and the only 'small town' applicant in Cheshire East in the 2026 DCMS competition for UK Town of Culture.
Borough's significant cultural, heritage and visitor economy contributes around £1 billion annually to GVA.

Comment

Local plan scoping consultation

Local plan period

Representation ID: 4284

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

I agree the proposal that the new Local Plan covers the period to 31 March 2045.
That respects limits to the relevance of the evidence base supporting the Plan. A period of longer than 31 March 2045 would risk confidence in that evidence.

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 4285

Received: 01/09/2026

Respondent: Mr Paul Webster

Representation Summary:

At para 5.13, the minerals land availability assessment methodology would usefully refer to the expected duration of the extraction of minerals from sites, and for the safeguarding of those sites prior to minerals extraction and for site remediation subsequent to minerals extraction.
Reasons cited for timescales for minerals. Example quoted of allocation of an Area of Search for sand, much of that area also proposed for residential and other uses in CEC's 'Call for sites'.
Para 5.83: "The Local Plan must … identify Mineral Safeguarding Areas (MSAs) and safeguard important mineral resources and infrastructure from sterilisation by non-mineral development."

For instructions on how to use the system and make comments, please see our help guide.