Local plan scoping consultation

Search representations

Results for High Legh Parish Plan Implementation Group search

New search New search

Comment

Local plan scoping consultation

Engagement Approach

Representation ID: 2866

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

If this is indeed the first step in producing a Local Plan, it is unacceptable that a version of the said plan is already in the public domain, including maps of potential development sites gained from old calls for sites made before the High Legh Neighbourhood Plan was completed and "made"

Comment

Local plan scoping consultation

Engagement Principles

Representation ID: 2867

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

The Local Plan should respect the policies and plans included in a Neighbourhood Plan

Comment

Local plan scoping consultation

Changes to Green Belt policy

Representation ID: 2868

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

The Plan must incorporate the policies and plans of a passed Neighbourhood Plan.
Any changes to Green Belt must be considered in light of assumptions in a passed Neighbourhood Plan

Comment

Local plan scoping consultation

Why prepare a new local plan?

Representation ID: 2869

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

Preparing the Local Plan should refer to the policies included in a Neighbourhood Plan and should not come to conclusions on issues that were wholly considered in the preparation of a Neighbourhood Plan. For example issues such as Green Belt, infrastructure to support proposals, traffic and transport availability, recreation facilities etc.

Comment

Local plan scoping consultation

Why prepare a new local plan?

Representation ID: 2870

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

How is this plan going to stand up and operate in the new combined authority

Comment

Local plan scoping consultation

Developing the new local plan

Representation ID: 2872

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

There is already evidence that information circulated has been misinterpreted. For example that a Plan is already in place

Comment

Local plan scoping consultation

Spatial development strategy

Representation ID: 2875

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

Cheshire East must have sufficient influence on this to ensure CE's difference with the surrounding Metropolitan areas, one of which (Warrington) may well want to wholly change the character of neighbouring Cheshire East areas

Comment

Local plan scoping consultation

Supplementary planning documents

Representation ID: 2876

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

A Design Guide was part of the HL Neighbourhood Plan and should be respected

Comment

Local plan scoping consultation

Connectivity

Representation ID: 2877

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

Connectivity for residents within CE is very poor with no road or rail transport serving most villages

Comment

Local plan scoping consultation

Green Belt

Representation ID: 2880

Received: 27/08/2026

Respondent: High Legh Parish Plan Implementation Group

Representation Summary:

Cheshire East's Green Belt areas are of prime importance, particularly in the north where villages are constantly approached by built-up areas such as Greater Manchester and Warrington

For instructions on how to use the system and make comments, please see our help guide.