Local plan scoping consultation
Search representations
Results for Sophie Molyneux search
New search
New search
Local plan scoping consultation
Identifying and assessing sites
Respondent: Sophie Molyneux
Representation Summary:
This objection argues that the proposed allocation of 291.03 hectares around Ashley is fundamentally unsuitable and contrary to local and national planning policy. Ashley occupies the lowest tier of the settlement hierarchy, lacking services and infrastructure needed to support significant growth. The site faces major transport constraints, airport-related restrictions, Green Belt protections, and risks to landscape, biodiversity and heritage assets. Development would also result in the loss of high-quality agricultural land, increase flood risk, and place unacceptable pressure on utilities. The respondent therefore requests that all 12 site parcels be classified as unsuitable, unavailable and undeliverable and excluded from future Local Plan allocations.
Full text:
I am writing to register an explicit formal objection to allocating or considering the 291.03-hectare tract of land surrounding Ashley across all 12 interconnected parcels within the SHELAA and broader Local Plan review. Promoting strategic development on this scale in an unsustainable rural location is entirely unfeasible and violates statutory planning frameworks.
1. Invalidation under Spatial Strategy and Settlement Hierarchy
• Lowest Settlement Tier: Under CELPS Policy PG 2, Ashley occupies the lowest tier of the local settlement structure, completely lacking the primary education, healthcare services, and employment opportunities required to support population growth.
• Violation of Sustainable Location Frameworks: Directing massive housing to an isolated rural settlement conflicts directly with CELPS Policy SD 1, Policy SD 2, and national plan-making guidelines requiring strategic development to be focused within Tier 1 Principal Towns and Tier 2 Key Service Centres.
2. Transport Infrastructure Deficits, Highway Hazards, and Aviation Restrictions
• Inadequate Rail Connectivity: Ashley station operates at a low frequency of just 1 train per hour in each direction and has no commuter parking. Service frequency will worsen following the opening of the funded station at Cheadle. In March 2026, Parliamentary Under-Secretary of State for Transport Keir Mather MP confirmed that reducing Ashley and Plumley service calls to one train every two hours is required by the Rail North Partnership Board to enable Cheadle's hourly stops. This reduction renders public transit unviable for prospective residents and fails national "well-connected station" criteria for higher-density rural growth.
• Network Pinch Points and Narrow Bridges: Local narrow lanes cannot absorb major vehicular volumes. Critical bottlenecks created by single-lane bridges over the railway line, River Bollin, and Birkin Brook would trigger severe cumulative congestion and road safety hazards, breaching CELPS Policy CO 1, Policy CO 4, and national transport policies.
• Aerodrome Safeguarding Hazards: Positioned directly beneath Manchester Airport operational flight paths, the land falls within noise restriction and bird-strike management zones, violating CELPS Policy SE 12 and mandatory aerodrome safety rules.
3. Severe Impacts on Landscape, Biodiversity, and Heritage Assets
• Landscape Degradation: Allocating these sites would irreparably harm the settings of both the Bollin Valley and Parklands Local Landscape Designation (LLD) and the Rostherne/Tatton Park LLD, breaching CELPS Policy SE 4.
• Ecological Severance: Paving over this open expanse would fragment established habitat corridors and imperil protected ecological sites, including the adjacent Cotterill Clough SSSI / Nature Reserve, violating CELPS Policy SE 3 and national nature recovery policies.
• Heritage Assets Compromised: The open fields frame the settings of 19 Grade II listed buildings, including Ashley Hall. Development breaches CELPS Policy SE 7 and national heritage protections requiring great weight to be given to preserving designated historic assets and their rural settings.
4. Non-Compliance with Green Belt Protections and "Grey Belt" Criteria
• Wash-Over Green Belt Status: The entire parish of Ashley carries "wash-over" Green Belt protection under CELPS Policy PG 3 to preserve its sensitive rural character.
• Encroachment & Settlement Coalescence: Ashley represents the narrowest remaining countryside gap separating Greater Manchester (Trafford, Hale, Altrincham) from Cheshire East (Knutsford, Mobberley). Developing the site drives urban sprawl and causes settlement merging, violating core national Green Belt objectives.
• Disqualification from "Grey Belt": Under Policy GB7 of the current NPPF framework, "Grey Belt" exceptions require land to make a negligible contribution to Green Belt purposes. This active farmland performs essential Green Belt functions, while its acute heritage, ecological, and flood constraints present severe barriers under national policy.
5. Destruction of Best and Most Versatile (BMV) Agricultural Farmland
• High-Grade Soil Quality: Land assessments (including HS2 Phase 2b survey data) confirm that the 291.03-hectare site consists predominantly of Grade 2 and Subgrade 3a BMV soil.
• Undermining Food Security: Converting this contiguous, highly productive agricultural area to housing threatens regional food production, violating CELPS Policy SE 2 and national mandates to safeguard top-tier agricultural land and prioritize lower-grade or brownfield options.
6. Drainage, Hydrological Risks, and Utility Infrastructure Inadequacies
• Surface Water & Flood Risks: Converting open farmland into hardstanding would dramatically increase runoff into the River Bollin catchment, compounding downstream flood risks in violation of CELPS Policy SE 13 and national flood resilience policies.
• Infrastructure Constraints: The site lacks the sewer network, power grid capacity, and utility infrastructure necessary for bulk residential development, failing the deliverability criteria of CELPS Policy IN 1.
Conclusion and Action Requested The submission across all 12 contiguous parcels (totalling 291.03 hectares) fails every applicable local and national planning policy. I formally request that Cheshire East Council record all 12 site parcels as Unsuitable, Unavailable, and Undeliverable in the SHELAA assessment and omit them completely from future Local Plan allocations.
For instructions on how to use the system and make comments, please see our
help guide.