Local plan scoping consultation

Search representations

Results for Pott Shrigley Parish Council search

New search New search

Comment

Local plan scoping consultation

Transport and infrastructure

Representation ID: 3461

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Adopt a transport-led approach to the location of growth, supported by settlement-level assessments of real journey times to work, school and health care, measured across the whole week rather than at peak hours.

Comment

Local plan scoping consultation

Transport and infrastructure

Representation ID: 3463

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

• Treat school, health, highway and utility capacity as a pre-condition of allocation. Where capacity does not exist and cannot be secured before first occupation, the location is not a sustainable one.

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 3466

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Publish the site assessment methodology, and the criteria for identifying sites, for public consultation before they are applied.
• Include within those criteria accessibility by public transport, walking and cycling; the capacity of the particular schools, GP practices, roads and wastewater catchment that would serve the site; flood risk and drainage catchment; landscape character and the setting of protected landscapes; and the significance and setting of heritage assets.

Comment

Local plan scoping consultation

Settlement hierarchy

Representation ID: 3467

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Publish the Settlement Hierarchy Review methodology for consultation before the hierarchy is fixed.
• Score settlements on measured criteria: bus frequency, destinations/days of operation; distance to a statio, GP list capacity; capacity at the schools that actually serve the settlement; and whether a safe, continuous walking or cycling route to the nearest service centre exists.
• Confirm that a settlement cannot move up a tier because it is near a larger place, or near a proposed development, when it does not have the services that define that tier.
• Distribute growth by capacity rather than land availability.

Comment

Local plan scoping consultation

Green Belt

Representation ID: 3469

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Carry out the Green Belt assessment in accordance with NPPF Annex E and publish it parcel by parcel, with the methodology consulted on beforehand.
• Assess and exhaust every other reasonable option for meeting development needs before Green Belt release is contemplated, and document the reasoning
• Keep landscape, heritage and biodiversity value assessed independently of Green Belt purposes.
• Apply the strategic green gap test across the whole borough on the evidence, and allow local green gaps to be designated through the Local Plan itself on evidence from a parish council.

Comment

Local plan scoping consultation

Housing

Representation ID: 3470

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Keep a rural exception sites policy along the lines of Policy SC 6, so that genuinely affordable homes can be built for people with a local connection at a scale suited to the settlement.
• Assess housing need at parish or output area level rather than grouping small parishes with larger neighbours. We welcome the Council's stated intention to use the smallest available output areas and ask that it is written into the plan.

Comment

Local plan scoping consultation

Town centres

Representation ID: 3472

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

We would like the towns to take the greater share of growth. Crewe, Macclesfield and Congleton have brownfield land, empty buildings and vacant retail floorspace, and they have the stations, buses, schools and surgeries that rural parishes do not. Directing growth there is better for the towns and better for the countryside.

Comment

Local plan scoping consultation

Natural environment

Representation ID: 3473

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Carry Policy SE 15 forward, so that development affecting the National Park and its setting continues to be assessed against the statutory purposes of the designation, and set out how Cheshire East will work with the National Park Authority
• Give full effect to the Cheshire and Warrington Local Nature Recovery Strategy,
• Include a landscape character assessment for the eastern fringe
• Assess heritage significance together with setting, maintain a local list of non-designated assets prepared with parish councils, and treat the Macclesfield Canal and its structures as a heritage corridor assessed as a whole.

Comment

Local plan scoping consultation

Local plan evidence base

Representation ID: 3475

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

Highway modelling covering unclassified rural lanes and local distributor roads as well as the A523 and the strategic network.
• A wastewater and water resource capacity assessment prepared with United Utilities on a catchment basis.
• Education capacity reported school by school, and public transport provision reported as journeys per day at parish level.
• All data reported at the smallest available output area, so that small parishes are not aggregated away, and evidence prepared jointly with the National Park Authority where it concerns the National Park or its setting.

Comment

Local plan scoping consultation

Introduction and Purpose

Representation ID: 3477

Received: 30/08/2026

Respondent: Pott Shrigley Parish Council

Representation Summary:

A distinct section on engagement with town and parish councils, setting out how and when they will be consulted and how their representations will be handled.
• Consultation periods of at least eight weeks, timed so that an ordinary parish council meeting falls within them,
• A published engagement log showing each parish and town council representation, how it was taken into account and what changed as a result.
• A standing liaison arrangement between Strategic Planning and parish councils at and joint working with the National Park Authority where a parish is divided by the boundary.

For instructions on how to use the system and make comments, please see our help guide.