Local plan scoping consultation

Search representations

Results for Just ASSC Property Ltd search

New search New search

Comment

Local plan scoping consultation

Identifying and assessing sites

Representation ID: 2450

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports a transparent, consistent and proportionate Land Availability Assessment methodology.
Site assessments should distinguish between fundamental constraints and issues capable of mitigation through design, infrastructure or other interventions.

Strategic sites should not be prematurely excluded where their scale could enable necessary infrastructure and mitigation to be delivered. Assessment criteria, assumptions, scoring and weightings should be published clearly. Where initial assessments identify deficiencies or require further evidence, landowners and promoters should have a reasonable opportunity to provide updated technical evidence or mitigation proposals before sites are excluded from further consideration.

Comment

Local plan scoping consultation

Spatial distribution

Representation ID: 2451

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports an evidence-led spatial strategy that considers a full range of options to meet identified development needs, including appropriate edge-of-settlement growth and larger strategic urban extensions.

The strategy should recognise the role of sustainable settlements with established services, employment and transport connections, while also considering development's ability to deliver infrastructure improvements. Larger strategic sites can enable comprehensive masterplanning, coordinated infrastructure, sustainable transport and green infrastructure that fragmented development may not achieve. Spatial options should therefore be assessed transparently and collectively against sustainability, infrastructure, environmental, deliverability and viability considerations.

Comment

Local plan scoping consultation

Settlement hierarchy

Representation ID: 2452

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports an evidence-led settlement hierarchy that directs growth towards sustainable settlements with appropriate services, employment opportunities and transport connectivity. Assessment should consider relationships with nearby employment areas and facilities, rather than relying solely on administrative or settlement boundaries. Settlement hierarchy and development capacity should remain distinct considerations, as capacity also depends on land availability, deliverability, environmental constraints and infrastructure. The resulting hierarchy should be transparent and based on current evidence, and should inform spatial distribution alongside the Council's infrastructure and land availability assessments.

Comment

Local plan scoping consultation

Green Belt

Representation ID: 2453

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports a transparent, consistent and evidence-led borough-wide Green Belt assessment that fully reflects current national policy, including identification of grey belt land. The methodology should clearly explain how land is assessed against relevant Green Belt purposes and be applied consistently.

Where development needs cannot reasonably be met elsewhere, appropriate Green Belt release should be properly considered through the plan-making process. Existing Green Belt designation should not prevent otherwise suitable and deliverable sites from objective assessment. Sustainability, accessibility, existing infrastructure and opportunities to improve sustainable transport connections should also inform the assessment.

Comment

Local plan scoping consultation

Planning for growth

Representation ID: 2454

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports a positive, evidence-led approach that identifies sufficient land to meet the borough's development needs throughout the plan period. The strategy should provide a balanced portfolio of sites of different scales, including sustainable strategic sites capable of delivering significant housing and supporting infrastructure.
Housing, employment, transport and infrastructure should be considered together when determining growth locations. The Plan should also provide sufficient flexibility and contingency in its land supply to maintain delivery where individual sites are delayed, requirements change or new evidence emerges, while ensuring development remains sustainable and deliverable.

Comment

Local plan scoping consultation

Housing

Representation ID: 2455

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports planning positively to meet identified housing needs over the full plan period, with a sufficient range of deliverable sites to maintain supply. The Local Plan should consider sites of different scales, including sustainable and deliverable strategic sites capable of making a meaningful contribution to housing delivery, housing mix, affordable housing and supporting infrastructure.
Housing requirements should remain under review, with sufficient flexibility to respond to updated evidence. Housing strategy should align closely with spatial distribution, settlement hierarchy, infrastructure and land availability evidence.

Comment

Local plan scoping consultation

Transport and infrastructure

Representation ID: 2456

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports integrating transport and infrastructure planning with spatial strategy and site selection. Assessments should distinguish between fundamental constraints and issues capable of mitigation through investment, design or new infrastructure, avoiding premature exclusion where deliverable solutions exist.
Strategic developments can provide opportunities to deliver or fund highway, public transport, walking, cycling, utilities, green infrastructure and community improvements. Accessibility should consider both existing provision and realistic opportunities for improved sustainable connectivity. The Infrastructure Delivery Plan should identify constraints, planned investment and mitigation and directly inform assessment of development locations.

Comment

Local plan scoping consultation

Local plan evidence base

Representation ID: 2457

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports a comprehensive, transparent and up-to-date evidence base, with housing, spatial distribution, settlement hierarchy, Green Belt, land availability, transport and infrastructure evidence considered collectively. Methodologies, assumptions, criteria and relevant datasets should be published wherever possible.

Evidence should distinguish between fundamental constraints and matters capable of mitigation through development, infrastructure or further technical work. Where site-specific evidence is incomplete, landowners and promoters should have a reasonable opportunity to provide additional technical information before potentially suitable and deliverable sites are excluded. The evidence base should remain under review throughout plan preparation.

Comment

Local plan scoping consultation

Spatial development strategy

Representation ID: 2458

Received: 24/08/2026

Respondent: Just ASSC Property Ltd

Representation Summary:

Just ASSC Property Ltd supports close coordination between the Cheshire and Warrington Spatial Development Strategy and the Cheshire East Local Plan. The Local Plan should continue without unnecessary delay while retaining flexibility to respond to emerging strategic priorities for housing, employment, transport and infrastructure.

Cheshire East's growth strategy should be informed by wider strategic infrastructure, transport and economic priorities, with growth locations assessed having regard to their wider functional relationships. Evidence supporting both plans should be coordinated and kept under review, ensuring potentially sustainable development opportunities are not prejudiced prematurely.

For instructions on how to use the system and make comments, please see our help guide.